Deployment & Installation
Questions about site surveys, safe-offset deployment, installation planning, infrastructure, and commissioning responsibilities.
44—54
Deployment & Installation
44How do we plan array placement for a five-kilometre perimeter?
A five-kilometre perimeter does not translate into a fixed number of arrays or a universal spacing rule. Coverage depends on site geometry, noise, obstructions, permitted installation boundaries and the required outputs. Published range context should not be used as a guaranteed node-spacing specification.
Begin with a site survey and a proposed coverage assessment identifying access, power, networking and responsible parties. If localisation is required, review surveyed geometry for suitable AOA bearing intersection. Validate the proposed layout under representative conditions before committing to a final deployment scope.
45What is the maximum cable run from an array to the control room?
The maximum run depends on the chosen power and communications design, not on acoustic sensing alone. No universal cable distance or supported transport arrangement is established here. The array's interface requirements and any intermediate equipment must be identified before infrastructure lengths can be assessed.
Provide the proposed route and site constraints, and request a configuration-specific infrastructure review by qualified personnel. Confirm the approved communications path, equipment responsibilities and acceptance tests in writing. Do not assume PoE, a particular cable type or an extension method is included without checking the selected configuration.
46Can the arrays be installed in ATEX or IECEx zones?
ATEX or IECEx suitability is not verified here. Passive acoustic sensing does not mean explosion-proof construction, and an outdoor enclosure rating is not a hazardous-area approval. Installation must be assessed against the actual area's classification and the exact equipment configuration.
Request any applicable certificates and check their product version, scope, conditions, issuer and validity with competent site specialists. The site survey should establish permitted installation boundaries before a location is chosen. Do not assume an array can enter a hazardous zone without the required equipment and installation review.
47Do we need concrete foundations?
Not every proposed installation can be assumed to require a new concrete foundation, but no universal foundation-free arrangement is established either. The need depends on the selected equipment, permitted location and support arrangement, all of which require site-specific review.
Provide the actual equipment dimensions and mass to qualified site personnel and confirm whether an existing structure or another approved location is suitable. Agree responsibilities for structural assessment, approvals and any civil works. Foundation type and sizing should come from the responsible project specialists, not a general product answer.
48How long does installation and commissioning take?
A standard installation or commissioning duration is not established here. The schedule depends on the agreed equipment and integration scope, site access, permitted locations, available power and networking, and readiness of any required civil works. Commissioning also needs clearly defined acceptance activities.
Request a project schedule separating delivery, site preparation, installation, interface checks and authorised performance validation. Assign responsible parties and prerequisites for each stage, then confirm acceptance criteria and handover requirements in writing. A hardware installation estimate alone should not be treated as the complete operational-readiness date.
49Who installs it: your team, a partner, or our contractor?
The installer and delivery responsibilities must be agreed for your project; a standard assignment to New Ark, a partner or your contractor is not established here. Local assembly, maintenance and spare-part arrangements can be discussed within written scope, but they do not automatically define installation services.
Specify who handles site preparation, mounting, infrastructure, system integration and commissioning, and who approves each stage. Confirm the qualifications and site permissions required for the work. A clear responsibility matrix helps avoid gaps between equipment delivery and an installation accepted by your facility.
50How is the system calibrated, and does calibration drift?
The calibration method, allowable drift and recheck interval need confirmation for the selected array and installation. No universal drift figure or calibration schedule is established here. Directional observations and any AOA bearing-intersection arrangement also depend on correctly surveyed geometry and suitable observations.
Ask for the project's calibration and verification procedure, responsible parties and acceptance measures. Confirm how changes to equipment position or the installation will be reviewed, and how questionable directional or position outputs are checked. Maintenance and recalibration obligations should be documented rather than assuming lifelong stability.
51What civil works and trenching are involved?
Civil works and trenching depend on the approved locations and the chosen power and network infrastructure. They are not fixed requirements of acoustic detection, and a universal excavation scope is not established here. Existing site infrastructure must be reviewed before assuming either new works or no works.
Use the site survey to document installation boundaries, access, available services and responsible parties. Request a project-specific civil and infrastructure scope with approvals and acceptance responsibilities clearly assigned. Qualified site specialists should determine routes and structural requirements; a product description should not be used as a construction design.
52Can it run on solar or battery power at remote sites?
Solar or battery operation needs a configuration-specific feasibility review; support for either is not established as a standard option here. The assessment must include the array and all associated processing and communications equipment, rather than considering only the sensor's power needs.
Confirm actual power requirements, intended operating periods, environmental conditions and permitted network arrangements with qualified project personnel. Define responsibilities for the complete remote-power solution and its acceptance. Do not assume a particular battery runtime, solar size or uninterrupted operation without a documented design and validation for the selected system.
53How do you protect the arrays from lightning, corrosion and vandalism?
Protection against lightning, corrosion and vandalism needs a site-specific equipment and installation review. No universal protection package or resistance rating is established here. Environmental exposure, permitted mounting locations, access and the chosen enclosure should be assessed together rather than assuming outdoor use covers every hazard.
Ask qualified site specialists to review the applicable protection requirements and request evidence for the exact delivered configuration. Agree responsibilities for installation protection, inspection and maintenance in the project scope. Keep equipment survivability distinct from guaranteed detection performance, and avoid treating a generic enclosure claim as a complete site-protection design.
54Can we start with a pilot and expand later?
A staged pilot and expansion plan can be discussed, but expansion compatibility and commercial arrangements must be confirmed for the chosen configuration. A pilot should test the site's acoustic conditions and required outputs, not be treated as proof that the same layout scales to every additional area.
Agree the pilot boundaries, targets, acceptance measures and data responsibilities before deployment. For later phases, confirm hardware and software compatibility, interfaces, surveyed geometry, infrastructure and support scope. Each expanded area should have its coverage and integration assessed rather than assuming the pilot's results guarantee wider performance.